Bid Q&A – 06/09/2022

Q15). On Section S- 1.02 Roof framing the drawing indicates (2) 8 1/2″ x 11 7/8″ glulam beams. One is approximately 18′ and the other approximately 8′. All of my …

Bid Q&A – 06/08/2022

Q11) Will the building be required to be winterized? Answer: Generally, No. However, a new “T” reducer valve with shut off shall be installed at the existing domestic water termination …

Bid Q&A – 06/08/2022

Q5) Could you please spec the 4’0″x 7’0″ T&G cedar exterior doors ? Please refer to the drawing titled “Sketch of Cedar Exterior Doors” in the Additional/Revised Bid Documents table …

Bid Q&A – 06/01/2022

Q1.) It appears in S 3.01 that the G1 girder is placed under the floor joist. S 3.01 is showing a floor joist span of roughly 26′. I am unaware …