Bid Q&A – 06/13/2022

Q32) Downspouts will terminate with a 90 elbow discharging to grade. Are splash blocks to be included?

Answer: The downspouts will be connected to drainage laterals below grade. The laterals will be installed by Sultana Education Foundation. GC to provide connection of downspouts to laterals.

Q33) Confirming that all landscaping and seeding/sod work is excluded from the scope of work?

Answer: All landscaping and seeding/sod work is excluded from the scope of work.

Q34) Drawing A1.31 – Room 108 shows Base to be #2 – Wood-grain ceramic tile. Is this correct?

Answer: Room 108 shall have Base #1: 1×6 White Oak with clear matte finish.

Q35) Drawing A1.31 – Rooms 102 & 103 show the Base to be #1 – 1×6 White Oak. The walls have ceramic tile wainscot, is the base correct or should it be ceramic tile?

Answer: The base for rooms 102 and 103 is correct at #1: 1×6 White Oak with clear matte finish.

Q36) The site is presently at rough finished grade, which means that approximately 16″ of material needs to be excavated to achieve the bottom grade for the 4″ gravel fill. Does this material need to be hauled off or can it be disposed of on site?

Answer: Excavation of area below building will be performed by Sultana Education Foundation prior to Construction.